Response options: European Commission, University, IMLS, Self funding, International institution (European Commission), Combination of private and government - depending on contract source, Combination of industry and government run by an NGO., self-funded, Putting together a range of scraps from other projects, small grants, my side gig, etc., Foreign governments (donors), My research does not require funding, European Union, Financing for my money, We have multiple of the above funding different projects, Currently self-funded and low cost, i don't know, Directed MSc research projects, Industry, National gov, industry and university pooled funding, Japanese Government
Response options: It was difficult to accruately answer these questions as we had two projects on two creeks: one project consisted of sampling water quality on Beartrap Creek while the other consisted of completing a culvert replacement on Sucker Creek. One was intensive monitoring, the other was not., This was a planning project and considered existing/ongoing monitoring data to set indicators and metrics for measuring progress., Note that the project is ongoing so results oriented data is not available yet., Pre and Post flow rates, Visual observation during site visits after completion, A sampling station was set up to compare this park site with the other Jackson Street Parking Lot site to analyze impacts for inclusion in future Stormwater Management guides., Impact based on water quality modeling, This project has not broke ground yet, so water quality sampling has not occurred., Hydrology monitoring, spot checks by conservation staff, Project funded multiple individual grant projects, each project may answer differently, bacteria monitoring at local beach (E.coli), Extensive baseline survey and cross-sectional data were collected - Project will be implemented in 2021 and follow-up survey data will be collected and compared to the baseline data. Cannot yet answer the next two questions in this survey., Flow monitoring, Post-implementation monitoring has not yet been conducted, Post restoration monitoring has not been performed yet, The Ohio EPA will include this project site in their long-term vegetation and wildlife monitoring program, regeneration and survivability counts of planted, young jack pine, N/A Land acquisition, This project is still ongoing. Final monitoring is pending completion of project deliverables.